Rebecca and Forrest,
I’m going to use this page to keep you updated about how the painting is going. Newest material is at the top.
Monday night March 28 tracing image with projector.
I saved at least several days doing it this way instead of manually scaling the drawing
Updating the lanai for some weather proofing and custom built easel.
I had to hinge it and screw it together so I could take it apart to move it off the lanai. The easel has eye hooks on the top to attach it to the rafters so the wind doesn’t blow it over.
- Lanai enclosed with 20 mesh screen to protect against rain/weather
- From the North showing easel Inside
- inside lanai showing table for doing pointillism on horizontal layout
- 7x4' easel in place
- Another view of lanai and easel
- Back of easel showing hinge and back detail







